Hydro Power Project (24MW)

The Melkhet Hydro-electric Project is a run-of-river type project with diurnal pondage. It will be located on river Pindar in the Chamoli District of Uttarakhand. Work on the project started in June 2023. The project will be commissioned by July 2025.

 The Melkhet Hydro-electric Project is a run-of-river type project with diurnal pondage. It will be located on river Pindar in the Chamoli District of Uttarakhand. Work on the project started in June 2023. The project will be commissioned by July 2025.

 

 

 

To be built at a cost of $41 million, the project entails the construction of:

Salient Features

Installed Capacity

24 MW

Design Discharge

36 m3/sec

Net Head

83 metres

Annual Energy Generation

142.53 million units